0
Project months
0
Cable meters
0
Instruments
0
Labour force

Linde Engineering

E&I installation air separation plant Röthenbach

Period: June 2018 – April 2019

Assembly work in the nature reserve

A particular challenge was the construction of the air separation plant in the middle of a nature reserve and under strict supervision of the environmental authorities and local environmentalists. Thanks to outstanding planning and excellent teamwork, the work was completed to the customer’s complete satisfaction without incidents or complaints.

Certified quality

The planned production capacity of the plant is 5,700 Nm³/h liquid oxygen and 18,100 Nm³/h liquid nitrogen with a storage capacity of 1,450 t oxygen and 2,900 t nitrogen. Both products are manufactured in a quality that allows their use in medical products as well as in the food industry. Accordingly, the site is validated according to GMP and certified according to ISO 9001, ISO 14001, ISO 22000 and ISO 5001.

Find out more about our service portfolio and the project-specific areas of work:

Please send us your inquiry or give us a call + 49 800 5893472