Labour force
0
Instruments
0
Cable meters
0
Project months
0

Linde Engineering

E&I installation for air separation plant Nordenham

Period: May 2019 until September 2019

Electrical and instrumentation installation for an air separation plant

After the successful installation of an air separation plant in Röthenbach, work could be continued immediately afterwards in the difficult environment of the zinc and lead smelter in Nordenham. Here, a second air separator was installed for Linde Gas within a very short time. In this project, our graduates of the bachelor’s degree course in assembly engineering from Dresden International University were able to successfully apply what they had learned for the first time in practice as managers. The result is impressive, as the project was completed safely and precisely within budget and on time, in accordance with the specified quality standards.

WWV Wärmeverwertung wwv linde nordenham mitteleres bild Linde Engineering Linde Engineering

And so it came as no surprise that the prerequisites for the successful acquisition of a further follow-up project had thus been created: The E&I installations for Linde’s air separation plant in Vejle, Denmark.

Find out more about our service portfolio and the project-specific areas of work:

Please send us your inquiry or give us a call + 49 800 5893472